Transportation Safety

One picture of the network, corridor to control room

When a crash closes a carriageway or a possession overruns, the transport management centre, road crews and rail teams need to be working from the same facts.

The challenge

Real pressures on the network

  1. 01

    Scattered incident reporting

    Crash and closure details spread across radio, phone calls and paper logs, so the picture is never the same for every team.

  2. 02

    Possessions that run over time

    Track work extending past the planned window with no shared record of who is still on the corridor when trains are due back.

  3. 03

    Slow detours and replacement transport

    Road closures and rail disruptions needing quick, coordinated decisions on diversions and replacement services across agencies.

How CommandPost® helps

Everything the network needs, in one place

From the transport management centre to the crew on the corridor, one shared operating picture keeps incidents, possessions and diversions moving together.

Incident Logging

One incident log for every team

Crashes, hazards and service disruptions logged once, with priority, status and assignee, visible to every agency on the response.

Integrated Maps

The corridor on a live map

Closures, detour routes, worksites and possession limits plotted on one map with uploaded track plans and reference locations.

Forms & Checklists

Safe working checks in the field

Track access permits, look-outs and pre-start checks completed on site, visible to the possession manager and the TMC as soon as they're saved.

Operation Schedule

One run sheet for the shift

Possession windows, bus replacement timings and detour changes on a shared schedule every team works from.

Contact List

Who to call, on every team

Rail control, road crews, tow operators and emergency services listed with role and direct contact, no searching for numbers.

File Manager

Plans and permits kept together

Track diagrams, traffic management plans and photos stored with the operation, ready for the debrief.

Incident timeline

A bridge strike closes the highway and slows the line

A truck strikes a rail bridge overnight. The transport management centre, road crews and rail control share one picture of the corridor.

  1. 05:12
    Bridge strike reported

    The TMC duty officer logs the strike from a passing patrol, marking the location and closing the northbound lane.

  2. 05:20
    Line speed restricted

    Rail control sets a temporary speed restriction over the bridge and tasks the possession supervisor to inspect the structure.

  3. 05:45
    Detour and replacement bus arranged

    A traffic crew signs a detour off the highway while the coordinator arranges a rail replacement bus for the affected section.

  4. 06:30
    Structural inspection clears bridge

    The possession supervisor confirms the bridge is undamaged and logs photos and the clearance time to the file.

  5. 06:52
    Line and lane reopened

    The TMC lifts the speed restriction and reopens the northbound lane once the inspection report is closed out.

Around the network

Transport management centreRail possession supervisorTrack work crewTraffic incident response crewBus replacement coordinatorEmergency services liaison

What changes for the network

  • Every agency on a closure works from the same incident record, not separate phone calls.
  • Possession supervisors can show exactly who was on the corridor and when it was cleared.
  • Detours and replacement services coordinated from one shared schedule and map.
  • A complete record of the response ready for the incident debrief or inquiry.

Bring your network onto one operating picture

See how CommandPost® supports transport management centres, rail possessions and incident response crews on the corridor.