One incident log, site and control room
Every hazard, plant fault or near miss is logged with a priority and an assignee, so the deputy, the control room and the mine manager see the same picture.

From a routine pre-start to a full mine evacuation, CommandPost® gives the control room, deputies underground and the emergency response team one shared log, one site plan and one handover.
Radio black spots in declines and open-cut voids mean a report waits until a deputy reaches a node or a truck reaches the surface.
Day shift, night shift, contractors and visitors move through the same site, and an evacuation muster has to account for every one of them.
A notifiable incident brings a site investigation and a regulator inquiry, both wanting the same timeline the shift handover already needed.
One operation, one log and one shift handover, whether the crew is doing a pre-start or standing up the Incident Control Centre.
Every hazard, plant fault or near miss is logged with a priority and an assignee, so the deputy, the control room and the mine manager see the same picture.
Pit design, underground plan and uploaded KMZ layers sit on one map with exclusion zones and muster points, so an evacuation call points everyone to the same ground.
Pre-start inspections, isolation permits and hazard checklists are filled in from the control room or underground, on a phone that keeps working without signal.
The shift run sheet carries every timing and open action into handover, so the oncoming deputy is not relying on a verbal pass-down.
Contractors, visitors and specialist crews sit on one contact list with their role, so a muster count or a mines rescue callout does not start with a phone tree.
Photos, statements and site plans from the response stay with the operation, ready to hand to the site investigation or the regulator afterwards.
Night shift, underground. A deputy's report of smoke starts an evacuation, a muster and a mines rescue callout before day shift takes over.
On a routine inspection in the decline, the shift deputy logs smoke haze near the number three conveyor transfer point as high priority.
The affected panel and travel road are called clear, and the control room opens an evacuation muster for everyone underground and on the surface.
ERT goes in with breathing apparatus to find the source, while the control room checks the muster against the crew and contractor lists.
The team confirms the fire is out and the belt isolated, mines rescue stands down at the portal, and the area is barricaded off.
The run sheet carries the timeline and open actions into day shift, and the notifiable incident is logged for the regulator.

See how CommandPost® would run a muster, an evacuation and a shift handover on your site, before you need it for the real thing.